Welcome to IMSS-TRADE d.o.o.
LIST OF REFERENCES

OVERVIEW OF SOME OF THE WORK PERFORMED IN BOSNIA AND HERZEGOVINA, SERBIA, FEDERAL REPUBLIC OF GERMANY, SOUTH AFRICA AND ITALY FROM 2009 UNTIL 2013.

No..
TYPE OF PERFORMED WORK
THE WORKSITE
1.
Welding and assembly works in the repairs of pipe system of firebox and convective steam superheater of steam boiler and the system of blowing the steam boiler
Mine and Thermal Power Plant Gacko, 300 MW, Gacko
2.

Works on the fabrication, disassembly and assembly of flue gas duct

Mine and Thermal Power Plant Ugljevik, 300 MW, Ugljevik

3.
Work on dismantling, prefabrication and installation of the complete system of vent and drainage pipes of steam boiler

Mine and Thermal Power Plant Ugljevik, 300 MW, Ugljevik

4.
Welding and assembly works in the installation of waste water systems
Mine and Thermal Power Plant Ugljevik, 300 MW, Ugljevik
5.
Welding and metal work on dismantling and assembling of impulse lines of oil processing plants (measuring equipment)

Oil Refinery Brod, Brod

6.
Welding and metal works in the assembly of underground pipes of district heating system of the city of Banja Luka

Heating Plant Banja Luka, Banja Luka

7.
Disassembly and assembly works for the replacement of inner components and the roof of electrostatic precipitators

Thermal Power Plant „NIKOLA TESLA B1“, 620 MW, Obrenovac

8.

Welding and metal works on prefabrication of economizer tube panels, 300 MW thermal power plant

Workshop „Rudnap Group“ „Minel Kotlogradnja“,Belgrade

9.
Disassembly and assembly works in replacing of overflow pipes between the upper and lower drum of the steam boiler and disassembly and assembly for the replacement of the steam super heaters

Copper Mining and Smelting Complex Bor, section, Power Plant, Bor

10.
Welding and metal works in prefabrication of stainless steel piping

Workshop “MONTAVAR metalna lola”, Beograd

11.

Disassembly and assembly works in the replacement the super heater
UE 1-1

Thermal Power Plant „SWM Services GmbH, HKW Nord“, Münchnerststr. 22, Unterföhring, München

12.

Welding and metal works in the repairs of pipe system of firebox, super heaters 2 and inter heaters 2

Thermal Power Plant „RWE Kraftwerk Neurath D“, 633 MW, Energiestrasse 1, Grevenbroich

13.
Welding and metal works in disassembly and assembly of the sides (pipe panel) of firebox
Rheinland Raffinerie Shell Godorf, Godorf
14.

Welding and metal works in the repairs of pipe system of firebox and convective tract of steam boiler

Thermal Power Plant „EnBW Kraftwerk Stuttgart“ Münster K21 - 26

15.
Welding and metal works on the making of pipe system of the burner of steam boiler

Workshop “Alstom Power Service GmbH”, Am Bahnhof 11, Neumark

16.

Disassembly and assembly works in the replacement of high compressive collector of the steam boiler

Thermal Power Plant „RWE Kraftwerk Niederaussem D“, Werkstrasse Bergheim

17.

Prefabrication and installation of pipelines

 Chemical Industry „Wacker Chemie AG“, Johannes Hess Strasse 24, Burghausen

18.

Welding and metal works in the repairs of firebox pipe system and superheaters 2 and interheaters 2

Thermal Power Plant „RWE Kraftwerk Neurath E“, 633 MW, Energiestrasse 1, Grevenbroich

19.

Disassembly and assembly works in the replacement of high compressive collector, compensator and the burner of steam boiler

Thermal Power Plant “RWE KW Huckingen”, 320 MW, Ehinger Strasse 200/Tor 1, Duisburg

20.
Disassembly and assembly works in the replacement of parts of the ducts in the thermal power plant

Thermal Power Plant „RWE Kraftwerk Niederaussem G“, 300 MW, Werkstrasse Bergheim

21.

Welding and metal works in the making of the condenser of steam turbine plant

Workshop „Balcke-Dürr GmbH“, Betriebsstätte Neubeckum, Industriestr. 17, Neubeckum

22.

Work on the dismantling of old and assembly of new super heaters III i IV

Oil Refinery “Shell Deutschland Oil GmbH, Rheinlandraffinierie Godorf“, Emil Hoffmann Strasse TOR 3, Godorf

23.

Work on the repairs of the hopper of firebox and of steam cooler of steam boiler

Thermal Power Plant “RWE Kraftwerk Neurath A”, 312 MW, Energiestrasse 1, Grevenbroich

24.
Welding and metal works on the repairs of the heat exchangers and the pipelines

Thermal Power Plant “RWE Kraftwerk Neurath, unit A i D”, 633 MW, Energiestrasse 1, Grevenbroich

25.

Work on the dismantling and assembly of the drum, top side, back side of the firebox, economizers, super heaters, injecting steam cooler and the burner of steam boiler. Work on the replacement of compensators, repairs of flue ducts and LUVO plants and the assembly of catalyst of DENOX plant

Oil Refinery „Shell Deutschland Oil GmbH“, Rheinland Raffinierie, Werk Süd, Ludwigshafener Str.1, Wesseling

26.

Welding and metal works in the making of high compressive steam super heaters

Workshop “Balcke-Dürr GmbH, Manufacturing Plant Mülheim”, Aktienstr. 23-25, Mülheim

27.

Welding and metal works in the routine maintenance of thermal power plants

Thermal Power Plant „EnBW Kraftwerk Altbach“, Industriestr. 11 i EnBW Kraftwerk Münster, Voltastr. 45, Stuttgart

28.
Welding and metal works in making of input and output ducts, steam drums, heat exchangers for waste gases high-compressive steam super heaters

Workshop “Borsig Service GmbH”, Bottroper Strasse 279, Gladbeck

29.

Disassembly and assembly work for the replacement of internal elements, the roof and parts of the sides of electrostatic precipitator

Thermal Power Plant „RWE Kraftwerk Niederaussem“, Werkstrasse Bergheim

30.

Welding and metal work in making of heat exchangers for China Petrol for Fbmhudsonitaliana S.p.A. Milano

Workshop “FBM Hudson Italiana (SPA)”, Via Valtrighe 5, Terno d’Isola, Italy

31.
Welding and metal works in the making of high pressure heat exchanger

Workshop “Nigel Manufacturing Works”, 23 Fifth Street Vosterkroon, Nigel